Injection Mold Building Service
We are providing Customized Precision Mold Manufacturing Services. we make tooling according your demand of tooling specification (2D /3D /specifications). Normally, the manufacturing period will be from to 15 days to 60 days which it depend on the part size, mold structure complex or not, accuracy and mold life. Our team should keep you posted on progress as that you should receive that weekly process report, inspection report, injection parameter sheet and trail video, also you may check them at our service terms.
Our mold building types as following:
•Large and Complex Molds •Two shot molds •High Precision molds, Components •Rubber molds •Silicone molds
•Inserted molding molds •Collapsible cores molds •Unscrew molds •Gear molds •Bi-mold BMC
•Multi-cavity (up to 64 cavities) molds •Jigs/Fixtures •Hot runner system (Mold master, Incoe, Husky, Syventive, YUDO )
Injection Mold Tool Making Capabilities
General Production Capabilities | Additional Services | Design Capabilities |
In-House Full Service Capability | Project Management | CAD Modeling (2-D, 3-D) |
Existing Tooling Transfers | Engineering | 3D Mold Design |
Mold Management/Mold Maintenance | Mold Making | Moldflow Analysis |
Mold Repair | Product Development | Design for Manufacturable |
Mold and product Design | •Early Stage Engineering Support | |
Engineering Support | •Quality Requirement Planning | Machining Capabilities |
Tool History Documentation | •Material Selection Consultation | CNC |
Molding problem Solutions | •Mold Concept Planning | EDM |
Moldflow Analysis | Quality Assurance | WEDM |
Tooling or Mold Offered | •Product Testing | Polishing |
Soft Tooling | •Material Testing and Validation | Texturing |
Hard Tooling | Rapid Prototyping | |
Tolerance limit Control (+/-) | Assembly | Lead Times Available |
Grade A2:±. .0005 in. Within Cavity Shape | Machining | Precision Machining |
Grade A1:±. .005 mm. Within Cavity Shape | Ultrasonic Welding | Average: 1 to 4Weeks |
Mold Materials Used | Hot Stamping | Injection mold |
P-20 | Pad and Screen Printing | Average: 4 to 8 Weeks |
H-13 | Painting & Decorating | Die Casting |
1.2738/1.2738H | Product Fulfillment | Average: 6 to 8 Weeks |
1.2718/1.2718H | Procurement | silicone&Robber Parts |
NAK80 | Manual and High-Speed Packaging | Average: 2 to 3.5 Weeks |
S136/S136H | Bar Coding | Rapid prototype |
2083 | Plating or coating | Average: 1 to 1.5 Weeks |